All-Tech Decorating Co. Established 1979
home
about us
our services
safety
employment
contact us
All-Tech Decorating Co. Logo
METAL WALL SYSTEMS

Car Dealership- LaGrange, CA

Fermilab National Accelerator

Erie on the Park

Batesville Casket Company

Chittenango High School

Bay City Medical Center- Bay City, MI

One Museum Place- Chicago, IL

United States Postal Service- Philadelphia, PA.
Chittenango High School  
The weathered factory fluoropolymer coated vertical wall panels experienced degradation down thru to the base galvanized metal. ATD was hired to remove as much coating by using high pressure water blasting then apply a highly durable air-dry fluoropolymer finish for maximum durability. On certain areas, nearly 100% of the factory finish was removed exposing a clean galvanized substrate; while other areas ATD had to perform additional surface preparation to prepare the factory finish to maximize mechanical and chemical adhesion of subsequent coating system. School activities including all sporting events and general access to the building required ATD to monitor for the safety of all occupants. • Client: Chittenango Central Schools
• Contract Value: $65,000
• Completion Date: September 2012